[1. CALL TO ORDER]

[00:00:31]

>> CALLED THE ROLL, PLEASE. >>

[4. APPROVAL OF MINUTES]

>> THE FIRST ITEM ON THE AGENDA IS THE APPROVAL OF THE MINUTES FROM THE DECEMBER 10, 2024 FPRA MEETING.

>> MOVED FOR APPROVAL. >> SECOND.

>> PLEASE CALL THE ROLE. >>

[5. ADDITIONS OR DELETIONS TO AGENDA AND APPROVAL OF AGENDA]

>> THE NEXT ITEM IS ADDITIONS OR DELETIONS TO THE AGENDA AND

APPROVAL OF THE AGENDA. >> ANY CHANGES TO THE AGENDA? I WILL ENTERTAIN A MOMENT -- MOTION TO APPROVE IT.

>> MOTION. >> SECOND.

>> CALLED THE ROLL. >>

>> NEXT HIS COMMENTS FROM THE PUBLIC.

>> THIS IS THE OPPORTUNITY FOR ANY MEMBER OF THE PUBLIC TO ADDRESS THE COMMISSION. IF YOU HAVE THREE MINUTES TO STATE YOUR

[7. CONSENT AGENDA]

NAME AND ADDRESS AND WE WILL GIVE YOU A 10 SECOND WARNING. I SEE NO MOVEMENT SO WE WILL PURSUE.

>> THE NEXT ITEM IS A CONSENT AGENDA OR ANY ITEMS ANY BOARD

MEMBER WOULD LIKE TO REMOVE. >> I WOULD LIKE TO CALL ITEM B.

>> B AS IN BOY. >> I WANT TO PULL ITEM D, AS IN

DAVID. >> ALL RIGHT.

>> CAN I HAVE A MOTION FOR THE REST OF THE AGENDA? THE CONSENT

AGENDA? >> SO MOVED.

>> SECOND. >> MOTION TO SECOND. THE REMAINDER OF THE CONSENT AGENDA, CALL THE ROLL, PLEASE.

>>

[b. Approval of Change Order No. 12 for General Contractor Services, Journey C & D Group, Inc. in an amount not to exceed $45,654.20 for the City of Fort Pierce Florida Highwaymen Museum renovation project to correct the parking lot elevation to prevent water intrusion.]

APPROVAL OF CHANGE ORDER NUMBER 12 FOR GENERAL CONTRACTOR SERVICES, JOURNEY CNN D GROUP INC. IN AN AMOUNT OT TO EXCEED 45,650 $4000.20 FOR THE CITY OF FORT PIERCE FLORIDA HIGHWAYMEN MUSES MIX RENOVATION PROJECT TO CORRECT THE PARKING LOT ELEVATION TO PREVENT WATER INTRUSION.

>> WE HAD DISCUSSED THIS MATTER A COUPLE MEETINGS AGO RELATIVE TO A LARGER CHANGE ORDER THAT WAS A COMPILATION OF SMALLER CHANGE ORDERS COMBINED INTO ONE FUNDING MECHANISM. I WOULD LIKE TO GET UNDERSTANDING OF THE CONTRACT AND WHAT THEY CONTEMPLATE DOING AS ADDITIONAL, $45,600 TO MITIGATE THE FLOOD ISSUE. THERE NEEDS TO BE AN EXPLANATION TO WHAT THEY ARE DOING AND WHAT OUR MONEY IS GOING TO.

>> ALL RIGHT, IS A CONTRACTOR HERE? PLEASE COME FOR, SIR, IDENTIFY YOURSELF, PLEASE. TO THE MICROPHONE RIGHT THERE.

>> GOOD AFTERNOON, COMMISSIONERS, THANK YOU FOR HAVING ME. MY NAME IS JOURNEY C & D GROUP, INC. AND THE LICENSED GENERAL CONTRACTOR.

SO THE $45,000 FOR THIS CHANGE ORDER IS, RIGHT NOW, THE ELEVATION OF THE SITE SITS ABOUT FOUR OR FIVE INCHES ABOVE GRADE OF THE BUILDING. SO THE PREVIOUS, THE WAY THE SETUP WAS , THE SITE CONDITIONS ARE, THEIR PREVIOUSLY EXISTING SITE CONDITIONS, THERE WAS A SMALL DRAIN THAT WAS SET RIGHT IN FRONT OF THEIR DOORWAY ENTRY. IT WAS SUPPOSED TO CATCH ALL OVERFLOW WATER FROM GOING WITHIN THE BUILDING. THAT DID NOT HAPPEN BECAUSE WE SAW WATER DAMAGE ALONG THE CORNERS OF THE WALLS OF THE BUILDING. AND SO, WHAT WE ARE PROPOSING IS TO LOWER , SO, BASICALLY, WHAT WE ARE GOING TO DO, WE GET A PULLBACK 5 TO NUMB SIX INCHES, THE ENGINEER WILL, MAKE THAT FINAL DETERMINATION OF HOW MUCH WE ARE GOING TO TAKE OFF AND WE WILL BRING THE ELEVATION DOWN TO BE ABLE TO ENSURE THAT THE WATER ISN'T RUNNING OFF TOWARDS THE BUILDING. RIGHT NOW, THAT IS HOW IT IS PITCHED. SO WE WILL PULLBACK THE ENTIRE PARKING LOT, SKIM IT DOWN 5, NUMB SIX INCHES AND BUILD IT BACK TO BE AT GRADE AND PITCH IT TOWARD THE OTHER DRAIN AT THE CENTER OF THE

[00:05:24]

PARKING LOT. >> SO FOR CLARIFICATION PURPOSES, YOUR FINISHED FLOOR HEIGHT AND THE PARKING LOT, THE PARKING LOT, WHEN YOU'RE DONE WITH IT, WOULD NOT BE FIRE -- HIGHER THAN THE FINISHED FLOOR HEIGHT. YOU'RE LOOKING TO GET IT UNDER THE FINISHED FLOOR GREAT HEIGHT?

>> CORRECT. OTHERWISE, THE CITY, THE CITY HAS MADE THIS INVESTMENT INTO THIS BUILDING, YOU WILL HAVE FLOOD ISSUES LATER DOWN THE LINE. SO WHEN WE IDENTIFIED THIS, WE WERE LIKE, YOU KNOW, THIS IS SOMETHING THAT DEATHLY NEEDS TO BE ADDRESSED BECAUSE OTHERWISE, YOU KNOW, THE WATER IS GOING TO CONTINUE TO FLOW INTO THE BUILDING. SO, YOU KNOW, WE BROUGHT IT TO AUDREY MOORE, THE PROJECT MANAGER'S ATTENTION. IT STARTS TO GO THROUGH HIS PROCESS BUT, YES, SIR. WE WANT TO MAKE SURE WE DON'T HAVE ANY ISSUES MOVING FORWARD.

>> YES, I GUESS MY POINT IS WE WILL SPEND $45,000 TO LOWER THE FINISHED HEIGHT OF THE PARKING LOT UNDERNEATH OF HEIGHT OF THE INTERIOR FLOOR, PROPERLY PITCH THE DRAIN, WHAT ARE THE STRAINS

GO TO, DO YOU KNOW? % >> THERE IS A CITY DRAIN RIGHT

IN THE CENTER OF THE STREET. >> IN THE PARKING LOT. SO WE WILL NEVER DISCUSSES DRAINAGE PROBLEM AGAIN?

>> NO, NOT UNDER MY WATCH. >> THAT IS WHAT I'M TRYING TO ACCOMPLISH. THANK YOU FOR THE INFORMATION.

>> SO THANK YOU FOR THAT POINT. SO THE ACTUAL SCHEMATICS IN THE DRAWINGS FOR THIS HAVE BEEN SUBMITTED TO THE BUILDING AND

PLANNING DEPARTMENT FOR THIS. >> NO, SIR, THAT COST IS WITHIN

THIS $45,000. >> THE ENGINEERING OF IT , THAT IS WHAT I AM CONCERNED WITH. WHERE IS THE WATER DESIGNED TO GO? I THOUGHT IT WOULD HAVE TO BE PART OF THIS. WE UNDERSTAND THAT AND WE UNDERSTAND HOW WE CAN GET TIED INTO THE CITY MUST BE STORMWATER, OBVIOUSLY, IS THAT WHERE THIS IS GOING?

>> CORRECT. THE ENGINEER'S FEES FOR DOING ALL THOSE CALCULATIONS, OF COURSE, IS WITHIN THAT $45,000.

>> OKAY. >> IT IS NOT IN ADDITION TO THIS. THE ENGINEER HAS ALREADY BEEN MADE AWARE OF IT. WE ARE GIVING HIM THE GREEN LIGHT AFTER GETTING APPROVAL FROM YOU GUYS TODAY. THEY ARE SET TO GO. THEY ALREADY UNDERSTAND THE SITE CONDITIONS, THEY HAVE VISITED AND THEY KNOW WHAT WE ARE LOOKING AT CO. WE HAVE REDONE THE SURVEY, JUST TO BE ABLE TO HAVE AS MUCH ACCURATE INFORMATION AS POSSIBLE.

>> SO WE UNDERSTAND THAT. SO BASICALLY WE HAVE A NEW PARKING LOT, NEW PARKING SURFACE AREA, YOU WILL RIP ALL OF THAT OUT,

CORRECT? >> RIGHT.

>> WHEN YOU COME IN, IT WILL BE LOWER IN THE PITCH GRADE THAT IT SAYS NOW BECAUSE THE PITCH GRADES AT TIRE.

>> FOR THE MOST PART, I DON'T WANT TO SAY IS COMING OFF THE CURB. THERE MAY BE A SLIGHT INCH SLOPE.

>> NOT THE STREET. >> NOTHING TO WHAT IT IS RIGHT NOW. BECAUSE, AGAIN, THE DIFFERENCE RIGHT NOW IS ABOUT 3 TO 4 INCHES TO THE BUILDING. WE ARE GOING DOWN ABOUT 5 OR 6 INCHES, DEPENDING ON WHAT THE ENGINEER TELLS US TO MAKE SURE IT IS NOT PITCHING TOWARDS THE BUILDING, IT IS PITCHING AWAY FROM THE BUILDING SO ANY STORMWATER WOULD NOT GO TOWARDS

THE BUILDING AT ALL. >> SO THAT PITCH, WE ARE OKAY ON RETAINING WATER RETENTION? ARE THERE ENGINEERS HERE?

>> WE ARE TRYING TO MAKE SURE WE ARE NOT PITCHING IT TOWARDS THE STREET AND IS COMING OFF THE PROPERTY. THERE IS A DRAIN THAT IS THERE THAT WE WOULD LOWER THE DRAIN DOWN TO BE ABLE TO MEET THE NEW ELEVATION OF THAT. WE ARE NOT RUNNING THE WATER OFF INTO THE STREET. NOW THE CITY WOULD HAVE TO DEAL WITH THE RUNOFF OF THAT ONTO THE STREET. YOU CAN'T DO THAT.

>> MORE RUNOFF SUBSEQUENTLY TO THE NORTHERN PART OF THE PARCEL, WHICH GOES INTO THE BACK OF THE MEANS COURT AREA, RIGHT?

>> THAT'S RIGHT. >> I'M NOT SURE THAT PROPERTY, THAT BIG OAK TREE SITS ON, IS THAT PART OF THIS PARCEL?

>> THE OAK TREE IS PART OF THE HIGHWAYMEN PARCEL. THERE IS ACTUALLY A DESIGN, WE ARE PUTTING PAPERS AROUND THAT SECTION. THERE IS, TO THE NORTH, THERE IS A VACANT LOT.

>> RIGHT. >> I THINK THAT IS THE ONE

YOU'RE PROBABLY REFERRING TO. >> EXACTLY . KNOW ABOUT THE PAPERS AROUND THE OAK TREE, SO THAT DESIGN. MY CONCERN IS, WHEREVER YOU PITCH THIS PARKING LOT TO PUSH WATER OFF TO, IN MY MIND, DID NOT WANT IT PUSHING IT NORTH. I DID NOT WANTED SETTLING ON THE PAVERS AND NOTED THE OAK TREE. I WANTED TO MAKE SURE I HAVE A CLEAR UNDERSTANDING OF WHERE THE WATER IS GOING AND THAT IT WILL BE PITCHED THE RIGHT WAY. I DO NOT WANT TO CREATE ANOTHER PROBLEM AND I DO NOT GOING -- ONE IT GOING WEST BECAUSE WE HAVE A TENANT TO THE WEST OF US.

>> BY CODE, IT HAS TO REMAIN ON THE PROPERTY. THERE'S A DRAIN THERE. WE WILL JUST RUN IT INTO THE PITCH TO THAT DRAIN. WE WILL

DO IT RIGHT. >> VERY WELL. IT IS ON RECORD NOW. I DON'T WANT SOMEONE COMING BACK AND SAYING WE FLOODED THEIR PROPERTY, WE CAUSED THIS OR THE WATER IS HOLDING OVER HERE, MY PAVERS ARE FLOATING NOW THEY HAVE TO REDO THEM. I WAS ONE OF THE ONES THAT BROUGHT THIS UP LAST TIME. I HIT

[00:10:03]

THE ROOF BECAUSE WE HAD CHANGE ORDERS.

>> SURE. >> I DON'T LIKE CHANGE ORDERS.

I WONDER WHERE THIS IS COMING FROM. NOW I KNOW BUT MY LAST QUESTION IS, THIS IS IT, RIGHT?

>> HIS FIRST CHANGE ORDERS? >> I WILL BE 100% FRANK WITH YOU. THERE IS THE QUESTION THAT HAS COME TO US TO BUILD A DUMPSTER ENCLOSURE THAT WILL HOUSE THE DUMPSTER SO IT IS NOT THERE. THAT WAS NOT ORIGINALLY PART OF THE SCOPE, BUT IT WAS BROUGHT TO US TO SEE WHETHER OR NOT WE COULD BUILD A DUMPSTER ENCLOSURE. SO THAT IS ONE CHANGE ORDER THAT WOULD HAVE TO BE DISCUSSED. YOU KNOW, WE BELIEVE IT COULD PROBABLY BE UP UNDER 10 GRAND TO BE ABLE TO DO SO, BUT WE HAVEN'T WALKED THAT PATH. I WAS GOING TO BRING THAT UP. IS THE SECOND ONE IS, DURING THE PROCESS OF THE PROJECT I DON'T KNOW HOW SOMEBODY, YOU KNOW, TOSSED A ROCK AND BROKE A WINDOW, WHATEVER, AND THIS IS MONTHS AGO. SO WE HAVE ALREADY ORDERED A REPLACEMENT WINDOW BECAUSE WHEN DOES TAKE A LONG TIME. THAT IS 1200 BUCKS. THAT

IS IT. >> LET'S GET IT ALL OUT .

>> OKAY. YEAH, SO THE LAST QUESTION, THIS IS A QUESTION THAT I HAVEN'T EVEN HAD A CHANCE TO TALK WITH AUDREY ON, SO RIGHT NOW, WE'RE IN THE MIDDLE OF PUTTING IN THE FLOORING FOR THE SECOND FLOOR. IF YOU REMEMBER, WHEN YOU CAME OFF THE ELEVATOR, THERE WAS A SLIGHT PITCH. WHEN YOU CAME OFF THE ELEVATOR, SO, FOR US TO MAKE SURE THAT THE FLOOR IS LEVEL, THERE IS, WE WERE TALKING WITH OUR FLOORING GUIDE. HE SUGGESTED PUTTING DOWN A SECOND LAYER OF PLYWOOD TO BE ABLE TO LEVEL THE FLOOR BECAUSE OTHERWISE WE ALREADY BOUGHT MATERIAL TO BE ABLE TO COVER BUILDING OUT A SMALL SLOPE FROM THE LEFT SIDE OF THE ELEVATOR TO SWING AROUND TO THAT. THERE IS LIKE A WALL, I DON'T KNOW IF YOU HAVE EVER, RIGHT ON THE NORTH SIDE OF THAT, SO WE CAN DO THAT AND MOVE FORWARD WITH THAT, BUT I LITERALLY JUST LEFT THE SITE AND SAID , I AM GETTING READY TO GO MEET WITH THE COMMISSION, LET ME BRING THIS UP. I DON'T HAVE ANY SECRETS, YOU KNOW, I DON'T HAVE ANY SURPRISES. I WANT TO BE ABLE TO BE CORRECT WITH YOU. AND SO WE CAN MOVE FORWARD WITH WHERE

IT THAT. >> BUT IT IS STILL A PROBLEM, OBVIOUSLY, BECAUSE IT IS A SLOPING ISSUE. IT IS AN IMBALANCE ISSUE. I DON'T KNOW IF IT IS ELEVATED. THAT COULD POSE LIABILITY CONCERNS FROM A.

>> YES, SIR. THAT IS WHAT I WANT TO MAKE SURE TO BE ABLE TO LOOK AT. THIS IS AN EXISTING BUILDING. IT IS JUST SOME OF THE THINGS WE ARE GOING TO, YOU KNOW, THINGS THAT ARISE DURING THE PROCESS. WE HAVE GONE THROUGH AND WE HAVE PREPPED FOR, WE WILL MAKE SURE IT IS AS GOOD AS POSSIBLE TO ENSURE THE MAJOR DEVIATION, BUT I HAVE PICTURES I COULD SHOW THE BOARD, AS WELL, BUT I BROUGHT LITERALLY, I JUST LEFT THERE AND I WANTED TO BRING

THIS TO YOUR ATTENTION. >> YOU CAN'T JUST FLOAT THE

FLOORS? >> THAT IS ESSENTIALLY WHAT WE ARE DOING. IT IS A WOOD FLOOR. WE WOULD BE FLOATING THE FLOOR WITH PLYWOOD. TO BE ABLE TO LEVEL IT OFF. THAT IS THE QUESTION ON WHETHER OR NOT THE BOARD WANTS US TO .

>> WE NEED AN ESTIMATE ON HOW MUCH IT IS TO FLOAT THE FLOOR.

>> WE ARE NOT ASKING FOR THAT TONIGHT.

>> I KNOW. >> WE WILL PRESENT IT PROPERLY SO THAT WAY YOU HAVE THAT IN CONSIDERATION. WE DID, WE CALCULATED ROUGHLY 53 SHEETS OF PLYWOOD. PLYWOOD RIGHT NOW IS $55 A SQUARE FOOT. EXCUSE ME, $55 A SHEET.

>> A SHEET. >> AND THEN JUST THE GLUE AND THE NAILING DOWN. SO WE ESTIMATE IT SOMEWHERE IN THE BALLPARK OF $4500-$4700. THAT WAS JUST BECAUSE I HAD THE CONTRACTOR THERE AND OUR UNDERSTANDING IS OF WHAT THE MARKET IS RIGHT NOW.

>> IS THERE A CRAWLSPACE? >> NO, SIR.

>> IT IS A SMALL SPACE BUT THAT IS WHERE THE DUMPSTER IS HOUSED

UNDER THAT FLOOR. >> OKAY. DO YOU GUYS HAVE ANY QUESTIONS? OKAY. SO I THINK YOU CAN HEAR OUR FRUSTRATION BECAUSE WE HAVE BEEN, WE ARE ALL ANXIOUS FOR THIS TO OPEN. WE HAVE KIND OF, IT HAS BEEN A MOVING TARGET. THINGS KEEP BEING DISCOVERED. I THINK WE ARE TO THAT POINT WHERE WE DON'T WANT ANYTHING ELSE DISCOVERED. WE WANT THIS TO OPEN.

>> LOOK, I WILL TELL YOU, AS FAR AS TIMELINE, WE SPOKE WITH THE CONTRACTOR. HE SAID IT WOULD ONLY TAKE HIM TWO DAYS AND HE CAN CONTINUE TO DO IT. HE WILL CONTINUE TOMORROW. I DON'T WANT THAT TO BE THE HOLDUP. FROM YOUR STANDPOINT, I BELIEVE THAT I CAN SHOW YOU THE EVIDENCE. I WILL BE OKAY WITH TAKING THE RISK

[00:15:17]

BECAUSE I WANT TO GET THIS DONE, AS WELL, RIGHT? I AM OKAY TAKING THE RISK, IF THE BOARD TELLS ME WE WILL GIVE STRONG CONSIDERATION FOR THAT. BECAUSE I DON'T WANT A DELAY FOR IT TO GO THROUGH THE PROCESS, BUT I WILL DO WHAT I NEED TO IN ORDER FAR AS ANYTHING ELSE, THE KITCHEN IS IN, THE WALLS, THE FIRST COAT IS ON. THE LIGHTING PACKAGE JUST GOT HERE. WE ARE GETTING READY TO START HANGING LIGHTS. THE DOORS WILL BE HERE TOMORROW. SO WE ARE COMING TOWARDS THE END OF THIS PROJECT.

AND SO, THE QUESTION OF, IS THERE ANYTHING ELSE BESIDES THAT? BECAUSE WE HAVE UNCOVERED AND WE HAVE DONE EVERYTHING WE NEEDED TO DO, THERE IS NOTHING ELSE I CAN EVEN FORESEE OR IMAGINE THAT I NEED TO COME BACK IN FRONT OF THIS BOARD TO

EXPLAIN. >> WE ARE TALKING BETTER FLOOR,

A DUMPSTER AND THIS ? >> YES, MA'AM.

>> WAS IT THREE THINGS? THE FLOOR --

>> THE FLOOR, THE WIND OUT -- >> THAT'S RIGHT, THE FLOOR.

>> MADAM CHAIR, I HAVE A QUESTION ABOUT THAT WINDOW, RIGHT? ARE THESE STORM PROOF WINDOWS IN THIS FACILITY? WAS

THAT THE ORIGINAL? >> THESE WERE THE EXISTING WINDOWS WE WERE NOT CHANGING OUT WINDOWS.

>> IS THAT ON THE GROUND FLOOR?

>> SO LITERALLY, THAT IS THE WHOLE REASON I WAS ASKING. HOW WOULD YOU BREAK THIS WINDOW WITH A ROCK? I FIGURED WE WERE PARTNERING -- HARDENING THIS BUILDING AND THE INVESTMENT IN THERE, MAYBE I AM WAY OFF ON THAT THEN BECAUSE THAT WAS MY

THOUGHT. >> THIS WAS AN EXISTING WINDOW.

>> ALL OF THE REST OF THE ONES ARE INITIAL WINDOWS, WE DIDN'T HARDEN ANYTHING WITH STORM PROOFING OR ANY OF THAT STUFF?

>> THAT WAS NOT PART OF THE ORIGINAL PROJECT PLAN.

>> I THOUGHT IT WAS. >> I THOUGHT SO, TOO. I REALLY

THOUGHT SO. >> OKAY. ANY OTHER QUESTIONS?

>> BOARD, I THINK WE HAVE TO THINK ABOUT THIS, RIGHT? WE ARE MAKING A MAJOR INVESTMENT IN A BUILDING THAT WE OWN AND I BROUGHT IT UP AND I WILL BRING IT UP AGAIN TODAY, THE SURROUNDING AREA CONCERNS ME. AND WANT IT IS ALL NICE AND LOOKING DECENT, VANDALISM ALONE IS GOING TO COST US MORE MONEY.

I'M NOT EVEN SITTING HERE TRYING TO BREAK IN JUST TO STAY IN THERE BUT THEY MAY WANT TO VANDALIZE IT. NOW WE HAVE TO DEAL WITH WINDOWS. THE LAST THING I WANT TO DO IS SHUDDER UP A WINDOW AND DESTROY THE BEAUTY OF THE BUILDING BECAUSE WE CONSTANTLY HAVE TO REPLACE WINDOWS.

>> SO THE CHANGE ORDER FOR IMPACT ON THIS.

>> THIS IS OUR BUILDING. I DON'T KNOW, YOU KNOW --

>> IT WOULD ALSO REMAIN NOT. >> EXACTLY, THAT IS MY POINT.

>> DO YOU WANT A SUBCONTRACTOR TO GIVE US A PROPOSAL FOR IMPACT

OF GLASS INSTALLATION? >> I THINK WE HAVE TO AT LEAST LOOK AT IT. I'M NOT SAYING TO DO IT BUT IT MAKES SENSE TO ME.

>> IN THE TIMELINE -- >> IF WE ARE TALKING ABOUT,

PLEASE, I WOULD LOVE. >> YEAH, I AM SITTING HERE LISTENING. I HAVE SAID THIS 1000 TIMES ABOUT THIS MUSEUM. IT IS OUR MUSEUM. WE ARE BUILDING THIS MUSEUM. BUT ALL OF US SITTING UP YOUR KNOW ONCE THIS MUSEUM IS OPEN, IT IS REALLY GOING TO BE A STATE MUSEUM ON A STATE WEBSITE, TALKING ABOUT GO TO FORT PIERCE, GO LOOK AT THE HIGHWAYMEN MUSEUM, SEND US SOME MONEY ABOUT THIS MUSEUM SO YOU KNOW IT IS GOING TO BE OTHER WEBSITE. SO WHATEVER WE NEED TO DO, I AM LIKE YOU, MADAM MAYOR, I AM READY FOR IT TO OPEN. WE CAN HAVE OUR BIG FESTIVAL. WHATEVER WE NEED TO DO, LET'S BUILD THIS BUILDING RIGHT THE FIRST TIME. I DON'T WANT ANYBODY COMING UP AN ELEVATOR, SLIPPING ON A SLOPE, I DON'T WANT NO WATER COMING INTO THE BUILDING. I DON'T WANT, WHAT COMMISSIONER JOHNSON SAID, I DON'T WANT NO WINDOWS I CAN THROW A ROCK AND BREAK. WE HAVE HIGH WOMEN PATRONS AND PORTRAITS, ART WILL BE IN THAT BUILDING. SO IF I CAN THROW A ROCK THROUGH A WINDOW, I CAN THROW A BRICK THROUGH A WINDOW AND GO IN. I AM JUST BEING HONEST WITH YOU. WE ARE TALKING ABOUT REVITALIZING THAT AREA, COMMISSIONER JOHNSON, YOU HAVE CONCERNS. YOU HAVE SAID IT BEFORE. WE ARE TALKING ABOUT THAT THIS IS ONE OF THE KEY PIECES TO THAT WHOLE AREA. TO

[00:20:10]

START EVERYTHING ELSE CHANGING IN THAT AREA, THAT IS WHAT WE HAVE TALKED ABOUT. SO THEY HAVE GONE THROUGH. THEY HAVE BEEN COME EVERY OTHER MONTH WITH A CHANGE ORDER. THEY HAVE GONE THROUGH AND TRIED TO FIX EVERYTHING THEY CAN DO. NOW I REFER TO THE COMMISSIONER, THIS IS YOUR AREA. YOU KNOW HOW YOU ARE GOING TO FIND STUFF. AND THEN I AM HEARING TONIGHT FROM COMMISSIONER JOHNSON WHEN HE ASKED THE QUESTION N, WHAT ELSE, THEY WENT TODAY AND READY TO SHOW US PICTURES. IT IS NOT LIKE THEY ARE TRYING TO, YOU KNOW, NICKEL AND DIME US. THEY ARE TRYING TO FIX THE BUILDING HOW WE SHOULD FIX THE BUILDING.

SO NOW IS THE TIME BECAUSE WE ALL WANT IT OPEN. NOW, IF WE WANT IMPACT WINDOWS, NOW IF WE WANT WHATEVER WE WANT, LET'S PUT IT ON THE RECORD. THEY ARE READY TO FINISH THE BUILDING. SO IF THAT IS WHAT WE WANT, LET'S DO IT. I AM LIKE YOU, MADAM MAYOR, MADAM CHAIR . I DON'T WANT ANYMORE CHANGE ORDERS. I UNDERSTAND CHANGE ORDERS BUT I ALSO KNOW WITH THIS PROJECT, OF ALL THE PROJECTS THAT HAVE COME BEFORE ME, SITTING IN THE SEAT HERE SINCE I HAVE BEEN SITTING IN THE SEAT, THIS PROJECT IS ONE OF THE CLOSEST ONES THAT WE ARE GOING TO BE ABLE TO PUT HER HANDS ON. SO LET'S BE PROUD ABOUT IT. IF WE HAVE TO TAKE A STEP BACK, I KNOW Y'ALL DON'T WANT TO HEAR IT, TO PUT SOME WINDOWS IN, PUT WHATEVER YOU WANT IN THERE, LET'S DO IT.

BECAUSE I WANT THIS TO BE RIGHT THE FIRST TIME. BECAUSE WHAT I DON'T WANT IS FOR US TO HAVE THIS BIG, GRAND OPENING, EVERYBODY IN THE STATE COMES, WE WILL INVITE EVERYBODY, YOU KNOW WE ARE, THE STATE COMES AND TWO MONTHS LATER WE HAVE TO CALL THEM OR HIRE SOMEBODY TO GO IN AND FIX SOMETHING. LET'S DO IT RIGHT. I KNOW WE ARE UNDECIDED. NOBODY WANTS TO HEAR CHANGE ORDERS, NOBODY WANTS TO SEE THESE BIG NUMBERS, BUT IF $45,000, ROUGHLY ROUNDED UP, $46,000 HERE, WILL KEEP WATER OFF THE STREET, WATER OFF THEM PROPERTIES, WATER AFFECTING THIS BUILDING, AND ENGINEERS AND OUR ENGINEERED DEPARTMENT AND THE BUILDING DEPARTMENT ARE FINE WITH THEIR DESIGN, I AM GOOD WITH THAT BECAUSE I AM TRUSTING YOU GUYS. WHATEVER YOU TELL ME, THAT IS WHERE THAT WATER BETTER GO. I WILL CALL Y'ALL. LOOK HERE, I WILL STAND IN THE BUILDING ON THE LOT, ON THE LOT NORTH, EAST AND WEST AND BE LOOK AND WHY AM I STANDING IN WATER?

>> COMMISSIONER? I GREW UP HERE. >> I KNOW YOU DID. I WILL CALL YOU AND SAY, WHY AM I STANDING IN WATER?

>> LISTEN, MY WORD, AS MUCH AS I RESPECT THIS COMMISSION AND THIS BOAR, I HAVE A MOTHER, BARBARA MOORE. AND THE REST OF MY FAMILY. IF IT IS NOT RIGHT, I RESPECT HAVING TO DEAL WITH YOU GUYS, BUT I HAVE TO DEAL WITH THEM.

>> I KNOW THAT. >> I TAKE PRIDE IN THIS BUILDING. JUST FROM A LEVEL OF COMMITMENT TO EVERYONE HERE, WE HAVE, WE WILL, THERE ARE THINGS WE HAVE TAKEN CARE OF BECAUSE OF WHAT WE BELIEVE THIS BUILDING NEEDS TO LOOK LIKE. AND NEEDS TO REPRESENT. I CAN'T TELL YOU, I WALK AROUND AND I TELL A LOT OF PEOPLE ABOUT THE PRIDE OF THIS BUILDING. I HAVE BEEN IN NEW YORK AND HAVE HAD CONVERSATIONS. THERE ARE PEOPLE THAT LIVE IN NEW YORK THAT I HAVE SCHEDULED TO CALL WHEN THIS BUILDING IS

DONE. >> THEY ARE READY TO COME.

>> THEY ARE. SO WE ARE COMMITTED. WE WON'T, THAT IS WHY I AM WILLING TO, IT TAKES A PROCESS FOR ME TO BE ABLE TO SUBMIT THIS CHANGE ORDER, BUT I AM WILLING TO GO TO TAKE THE RISK OF TELLING MY SUBCONTRACTOR TO GO FORWARD BECAUSE IT IS THE RIGHT THING TO DO AND DEAL WITH WITH THE CITY. BUT I DON'T WANT TO SLOW DOWN BECAUSE WE WANT TO COMPLETE THIS AND WE WANT IT DONE RIGHT. SO IF YOU GUYS APPROVE YOUR CHANGE ORDER, THE PARKING LOT, I WILL GET A CHANGE ORDER FOR THE IMPACT WINDOWS AND I WILL WORK ON THE CHANGE ORDER FOR THE FLOORING ON THE SECOND FLOOR BUT I WOULD LIKE TO BE ABLE TO CONTINUE AND CALL MY SUBCONTRACTOR WHEN I LEAVE HERE TONIGHT.

>> I THIS, SO, IT IS ON THE PUBLIC RECORD, I MIGHT NOT HAVE TWO NUMBERS TO THOSE PEOPLE SITTING

[00:25:07]

BEHIND YOU, BUT YOU KNOW I HAVE YOUR NUMBER.

>> YES, SIR. YES, SIR. >> I AM JUST PUTTING IT ON THE RECORD, LET'S DO IT RIGHT BECAUSE IF I GET A CALL OR AN EMAIL, YOU BEST BELIEVE I AM GOING TO CALL YOU AND ASK YOU

WHY I AM GETTING THESE CALLS. >> YES, SIR. I WILL PUT YOU IN FAVORITES SO THAT WAY YOU COME THROUGH FIRST.

>> WITH THAT BEING SAID, I TURNED BACK TO THE COMMISSION.

>> THANK YOU. >> THIS IS OUR BUILDING. THIS IS OUR PROJECT. THIS IS OUR TIME TO PUT SOMETHING OUT TO START TAKING AWAY FROM THE NEGATIVITY THAT IS COMING TO FORT PIERCE.

WE CAN START HERE. SO IF MY FELLOW COMMISSIONERS DOWN THERE WANT TO NOW TALK ABOUT WINDOWS OR WHATEVER, LET'S START THE PROCESS AS SOON AS POSSIBLE. IT MIGHT NOT HAVE TO BE TONIGHT.

LET THEM GO DO SOME WORK IN GET TOGETHER AND LET AUDREY DO WHATEVER, THAT IS SOMETHING WE WANT TO DO BUT LET'S MAKE THIS RIGHT, GUYS. LET'S DO RIGHT AND TAKE IT FROM THERE.

>> A COUPLE OF COMMENTS ON THAT, COMMISSIONER GAINES. I JUST SIGNED DEPOSIT CHECKS TODAY FOR $64,000 FOR IMPACT GLASS WINDOWS ON THE BUILDING WE OWNED. DELIVERY TIME IS FOUR TO SIX MONTHS. HAVING SAID THAT, DO YOU TAKE THE POSITION THAT THE IMPACT GLASS WINDOWS CAN BE INSTALLED WHILE THE FACILITY IS

IN OPERATION? >> THEY CAN BE INSTALLED WHILE IT IS IN OPERATION. WHAT I WILL DO, AS SOON AS I LEAVE HERE, THE WINDOW COMPANY WE ARE WORKING WITH, THEY ARE WITH PGT SO THEY GIVE PREFERENCE. THERE IS ONLY, I THINK, FOUR OR FIVE IN THE STATE. SO THEY GET PREFERENCE. MY GOAL IS TO TAKE PICTURES OF EXISTING WINDOWS. THEY ALREADY KNOW BECAUSE THEY HAVE BEEN ON SITE. THEY WORKED ON THE ONE THAT WAS BROKEN. TO TELL THEM I NEED A COST FOR ALL OF THESE WINDOWS AND TO ALSO GET A TIMELINE BECAUSE I WANT TO BE ABLE TO MAKE SURE THAT IT IS AS CLOSE TO WHEN IT IS COMPLETE OR SEE WHAT THAT TIMELINE IS.

>> I FULLY ADVOCATE DOING THIS. I THINK FROM A SECURITY ASPECT, THIS IS A VERY SIMPLE SCENARIO. WE NEED TO INSTALL THEM. IT WILL BE HUNDREDS OF THOUSANDS OF DOLLARS OF ARTWORK IN THE FACILITY THAT, AS COMMISSIONER GAINES THAT, ALL YOU NEED TO DO IS THROW A BRICK IN YOUR IN. BEFORE THE POLICE ARE ABLE TO RESPOND POTENTIALLY, THAT IS A LOT OF MONEY GONE AND VALUE. I THINK THIS IS A NECESSITY TO PROTECT THE ASSET , PROTECT THE CONTENTS OF THE ASSET, ET CETERA. I UNDERSTAND IT IS A LENGTHY TIME TO GET THOSE MATERIALS BUT AS SOON AS YOU CAN GET THEM. ONE OF THE THING, COMMISSIONER JOHNSON WILL SHARE

YOUR NUMBER WITH ME. >> I HOPE THE WHOLE COMMISSION HAS IT. THIS IS MY HOMETOWN. SO I DON'T RUN FROM, YOU KNOW, ANY CLIENTS THAT WE WORK WITH. YOU KNOW, I AM UP HERE OFTEN. SO I WANT TO BE ABLE TO COME TO THE CITY AND KNOW THAT WE HAVE DONE A GOOD JOB. YOU KNOW, I WANT OTHER KIDS THAT GREW UP HERE, THAT GO TO ANY SCHOOL HERE TO KNOW THAT SOMEONE FROM THIS COMMUNITY CAN COME BACK AND BUILD IN THIS COMMUNITY AND

WORK. >> THAT IS WHAT WE WANT, A GREAT PRODUCT WE DON'T HAVE TO GO BACK IN TOUCH FOR A LONG TIME. I AGREE WITH COMMISSIONER GAINES. THIS WILL BE A STATEWIDE EVENT WHEN THIS FACILITY OPENS AT RIGHTFULLY SO. IT WILL BRING IN PEOPLE FROM ALL OVER THE COUNTRY TO TOUR THIS FACILITY. SO I COMPLETELY SUPPORT COMMISSIONER GAINES'S INITIATIVE. LET'S JUST MOVE ON. THIS IS ONE OF THOSE THINGS, IT IS A SOUND INVESTMENT IN THE COMMUNITY, THE CITY, THE RESIDENTS AND SUPPORTING AN INITIATIVE THAT IS VITALLY IMPORTANT TO THE CITY. I

FULLY AM ON BOARD WITH THIS. >> SO, COMMISSIONERS, I FULLY SUPPORT WHAT YOU ARE SAYING. I GUESS THE FRUSTRATION THAT IS ON ME RIGHT NOW IS, I AM A COMMISSIONER. I DON'T DO DAY IN AND DAY OUT PROJECT MANAGEMNT.

>> YES, SIR. >> JUST ME QUESTIONING, I HAD TO FIGURE OUT WE DID NOT HAVE IMPACT GLASS IN THIS PLACE. I DON'T KNOW WHO TO BLAME FOR THAT. I'VE GOT TO LOOK AT MYSELF FOR NOT ASKING THE RIGHT QUESTIONS, I GUESS, WHEN THIS CAME TO US BECAUSE THAT SHOULD HAVE BEEN A NONNEGOTIABLE. FROM DAY ONE. I AM NOW CONCERNED ABOUT THE DOORS.

>> THE DOORS ARE IMPACT. >> OKAY.

>> THE DOORS IMPACT. IF I MAY, I THINK, FROM THE ONSET OF THE PROJECT AND THE SCOPE OF WORK, IT WAS ALSO TIED TO THE STATE.

>> THE GRANT? >> THE STATE GRANT. I THINK THE SCOPE OF WORK THAT WAS THERE PROBABLY HAS SOMETHING TO DO WITH IT. I DON'T KNOW IF IT IS NECESSARILY, YOU KNOW, SINGLE PERSON THING BUT YOU KNOW DOES TAKE

[00:30:10]

>> I BLAME MYSELF. WE TALK ABOUT THE SECURITY OF THIS, HARD LEARNING THIS AND FIRE SUPPRESSANTS AND EVERYTHING ELSE WE NEEDED IN THIS BUILDING, EVEN, I REMEMBER TALKING ABOUT A LEVEL OF GLASS THAT COULD KEEP THE HEAT AWAY FROM A CERTAIN DEGREE. I REMEMBER THOSE CONVERSATIONS. FROM MY MIND, I WENT TO SOME TYPE OF IMPACT GLASS. NOW COME TO FIND OUT, IT IS FRUSTRATING TO ME. I AM ALL IN SUPPORT OF GETTING THE GLASS AND ALL THAT STUFF THE BACK BUT I KNOW WHAT I WENT THROUGH IN THE QUESTIONING AND NOW TO FIND OUT THIS IS JUST REGULAR GLASS IS A PROBLEM. BECAUSE WHAT YOU ARE TELLING ME IS, WE ARE GET OPEN A MUSEUM WITH REGULAR GLASS AND THERE WAS A BIG CONVERSATION ABOUT PROTECTING THE ART IN THERE FROM JUST THE HUMAN ELEMENT, THE SUN, THE RAIN AND EVERYTHING ELSE.

>> WHAT I AM GOING TO DO AS SOON AS I LEAVE HERE, I WILL TAKE STOCK OF WHAT IS ACTUALLY THERE, JUST TO BE ABLE TO EASE EVERYONE'S MIND ON WHAT IS ACTUALLY THERE. I HAVE A PICTURE OF THE ONE THAT WAS BROKEN, BUT I WILL TAKE STOCK OF EVERYTHING THERE TO BE ABLE TO MAKE SURE THERE IS NO NEED TO SPEND MONEY, THERE IS NO NEED TO SPEND MONEY. I WILL GO THERE MYSELF TODAY TO MAKE SURE AND ENSURE THAT EVERY GLASS THAT IS ACCOUNTED FOR THAT NEEDS TO BE REPLACED, IF ANYTHING IS ALREADY, IF WINDOWS HAVE BEEN REPLACED OVER TIME, THAT MAY BE IMPACT, I WILL GET THAT INFORMATION TO THE COMMISSIONERS.

>> THAT WILL BE HELPFUL. I AM FULLY IN SUPPORT OF IT, DON'T GET ME WRONG. I AM JUST FRUSTRATED BECAUSE I REMEMBER

THAT CONVERSATION DIFFERENTLY. >> YOU HAVE MY WORD AND MY

COMMITMENT. >> WE WERE AWARE THIS WAS AN OLDER BUILDING. IT WAS NOT BUILT TO BE AN ART MUSEUM. WE KNEW THAT WE HAD TO DO CERTAIN THINGS IN ORDER TO PROTECT THE ART. NOT ONLY FROM A SECURITY STANDPOINT BUT ALSO CERTAIN AIR TEMPERATURES AND THINGS I DON'T KNOW ANYTHING ABOUT BECAUSE I HAVE NEVER BUILT AN ART MUSEUM, RIGHT? HAS ANYBODY UP HERE EVER BUILT AN ART MUSEUM? NO.

THIS IS, UM, THIS IS AN OLDER BUILDING. WE DO WANT TO DO IT RIGHT. I THINK YOU ARE HEARING THAT FROM EVERYBODY. EVEN THOUGH WE ARE ANXIOUS, LIKE, WE WANT IT ASAP, WE WANT IT RIGHT ASAP. I GUESS WHAT WE CAN ONLY DO TONIGHT IS VOTE ON THIS, YOU

HAVE DIRECTION ON THE OTHER? >> IS THERE A MOTION FOR THIS?

[d. Approval of Inspire Placemaking Collective Specific Authorization No. 1 in the amount of $99,500.00 for the Downtown Park Conceptual Design]

>> I MOVED TO APPROVE THE CHANGE ORDER.

>> SECOND. >> CALL THE ROLL, PLEASE.

>>

>> THANK YOU, COMMISSIONERS . >>> THE NEXT ITEM IS APPROVAL OF INSPIRE PLACE MAKING COLLECTED OF SPECIFI AUTHORIZATION NUMBER 1 IN THE AMOUNT OF NINE $9500 FOR THE DOWNTOWN PARK CONCEPTUAL

DESIGN. >> MADAM CHAIR, I PULLED THIS BECAUSE I WANTED TO GET THIS EXTRA ATTENTION AND NOT HAVE IT FLY BY. I WAS EXCITED TO READ THIS, NOT ONLY THE PROCESS WE ARE GOING THROUGH, THIS IS PART OF I THINK THE STRATEGIC PLAN WE TALKED ABOUT BUT NOW IT IS, YOU KNOW, HOW DO WE HAVE A DOWNTOWN CONCEPTUAL DESIGN AROUND THE MARINA AREA, BUT WHAT I WANT TO CALL ATTENTION TO AND KEEP THIS OUT IN FRONT IS THAT WE WILL BE SEEKING PUBLIC INPUT. WE HAVE GOT TO GET THE PUBLIC TO UNDERSTAND WE NEED THEM TO SHOW UP AND GIVE INPUT TO THIS DESIGN, WHAT THEY WOULD LIKE TO SEE. WE'VE GOT A LOT OF PEAK INTEREST IN THIS AREA ALREADY WITH THE FARMERS MARKET, THE STATE RATED HIGHLY SUCCESSFUL FARMERS MARKET, THE CRAFT MARKET, THE CHRISTMAS TREE LIGHTING WE DO, FRIDAY PAST, YOU KNOW, BUT I THINK THIS, AGAIN, STARTS THE SCOPE OF WHAT DOWNTOWN IS STARTING TO TAKE SHAPE OF, AS WELL AS THE PROJECT. I WAS REALLY EXCITED, I SAW THE BIG NUMBER THAT MAY BE DIG IN TO SEE WHAT IS ALL THERE. WHEN I READ IT, I UNDERSTOOD IT.

I JUST WANT OUR COMMUNITY TO KNOW THAT THIS WOULD HAVE GONE BY CONSENT AND NOBODY WOULD HAVE READ IT, BUT THIS IS THE BEGINNING OF HOW WE DESIGN THAT DOWNTOWN MARINA SQUARE AREA TO BE A GREAT PLACE FOR THE WATER AND FOR ALL RESIDENTS TO ENJOY AND WE NEED THEIR INPUT. THAT IS REALLY WHAT I WANTED TO

HIGHLIGHT THAT ISSUE. >> ANY OTHER COMMENTS?

>> I DID WANT TO MAKE ONE. WHEN I READ IT, I THOUGHT WE DID HAVE A DESIGN. WE ARE BUILDING ON THE DESIGN WE HAD THAT WE STARTED

AT. >> WE ARE BUILDING ON THE DESIGN

WE HAD AND REFINING IT. >> THAT IS WHY WE ARE DOING THE COMMUNITY MEETINGS , TO FURTHER REFINE, YOU KNOW, THE DESIGN THAT WAS THERE AND GET ADDITIONAL IMPACT STATEMENTS

FROM THE COMMUNITY. >> YEAR.

>> ANY OTHER COMMENTS? >> I'M JUST GLAD YOU BROUGHT THIS UP, COMMISSIONER JOHNSON. I WOULD LIKE TO KNOW FROM STAFF,

[00:35:05]

HOW ARE WE GOING TO GET THE WORD OUT FOR THE COMMUNITY INPUT? US SAY ONLY ONE COMMUNITY INPUT IS ONE THING, BUT GETTING THE WORD OUT FOR PEOPLE TO ACTUALLY COME AND BELIEVE THAT THEIR INPUT MATTERS . IT IS ONE THING IF THEY COME BUT TO GET THE WORD OUT, THIS IS YOUR DOWNTOWN ALSO, YOU KNOW, YOUR INPUT, YOUR INPUT MATTERS, BELIEVE IT OR NOT, I WILL BE THE STICKLER OVER HERE, SOME PEOPLE IN THE COMMUNITY THINK THE DOWNTOWN IS NOT THERE DOWNTOWN. LET'S JUST BE HONEST. THIS IS EVERYBODY'S DOWNTOWN.

THIS IS YOUR CHANCE TO COME AND GIVE YOUR INPUT AND YOUR INPUT WILL BE TAKEN INTO CONSIDERATION. I WOULD JUST LIKE TO KNOW HOW WE ARE GETTING GET IT OUT TO THE PUBLIC?

>> IS THAT FOR YOU, MS. OGATA? >> OKAY. MEMBERS OF THE BOARD, WE ARE WORKING WITH INSPIRE AND ONE OF THE PHASES OF THAT IS THE WORKSHOPS. THEY WILL BE HAVING COMMUNITY WORKSHOPS. I HAVE ALREADY SPOKEN TO THEM AT THEIR LAST MEETING ABOUT THIS PROJECT, AS WELL. AND WORKING WITH OUR MARKETING DEPARTMENT, AS WELL.

THOSE ARE JUST SOME OF THE ONES BUT INSPIRE IS REALLY GOOD AT GETTING THE WORD OUT WITH OUTREACH.

>> THANK YOU FOR THAT. CAN I MAKE THREE SUGGESTIONS TO PUT ON YOUR LIST? THIS IS JUST ME. THE HISPANIC COMMUNITY , ASIAN-AMERICAN COMMUNITY, THE YOUTH. HIT THE HIGH SCHOOLS. HIT 11TH AND 12TH GRADERS, HIT THE HIGH SCHOOLS. START WITH NINTH GRADE. HIT THE HIGH SCHOOLS AND ASK THEIR INPUT ON WHAT THEY WOULD LIKE TO SEE IN A DOWNTOWN AREA . THE REASON I SAY THAT ABOUT THE YOUTH IS IF THEY LIKE SOMETHING DOWN THERE, THEY WILL COME SPEND MONEY. THEY WILL HAVE A GOOD TIME. IT IS FOR EVERYBODY. THOSE ARE THE THREE I WOULD HIT. THAT IS JUST GETTING SOMETHING TO THE SCHOOL OR THE SCHOOL LETTING THEM, YOU KNOW, HAVE IT ON CAMPUS AND SUBMIT IT BACK TO THE CITY OR THE YOUTH COUNCIL TAKE THE LEAD, LET THE YOUTH COUNCIL TAKE THE LEAD AND GET INFORMATION BACK TO YOU. THANK YOU FOR ASKING THE

QUESTION. >> ANYTHING ELSE? OKAY. THANK

YOU VERY MUCH. >> WITH THAT, MADAM CHAIR, I

WILL MAKE A MOTION. >> THERE IS A MOTION AND A

SECOND. >> PLEASE CALL THE ROLL.

>>

[a. Update from Innovative Masonry Restoration (IMR) on the Completion of the Exterior Renovation of Old St. Anastasia]

INNOVATIVE MASONRY RESTORATION ON THE COMPLETIN OF THE EXTERIOR RENOVATION OF OLD ST. ANASTASIA.

>> YES, MA'AM. WE HAVE MISSED ELGATO JOINING US. WHAT SHE IS GETTING READY, WE HAVE SOMEBODY TO JOIN US FROM THERE.

>> ALL RIGHT. >> WHILE SHE IS DOING THAT, WE WERE TALKING BEFORE THE MEETING ABOUT DOING CALENDAR SWITCHING.

WE ARE NOT DOING THAT. YOU WILL KEEP YOUR ORIGINAL SPOT.

COMMISSIONER TAYLOR, WE WILL FIGURE SOMETHING OUT. THERE ARE

WAY TOO MANY. >> WE ARE SORRY, YOU MUST FIRST

DILUTE 1 OR 0 PLUS AREA CODE. >> LET ME TRY ONE MORE TIME.

>> HELLO, THIS IS BOB. >> HI, BOB. THIS IS SARAH.

>> WHAT'S GOING ON?

>> OKAY. WHO IS BEGINNING, WHO IS STARTING?

>> WE HAVE JIM DOLBY ON THE PHONE WE HAVE THE ARCHITECT.

>> WHAT IS YOUR NAME? >> JIM DOLBY.

>> OKAY. WHO IS STARTING? OKAY. >> I AM FROM INNOVATIVE MASONRY RESTORATION. THANKS FOR HAVING ME. WE ARE JUST, WE ARE RESTORING THE OLD SEEN ANASTASIA BUILDING. THE PROJECT WAS KIND OF INTERESTING. WE HIRED THE ARCHITECT. WE CHOSE BOB MACK , HE IS ON THE PHONE. HE IS ONE OF THE PREMIER HISTORIAN PRESERVATION FIRST. HE WAS INSTRUMENTAL IN DEVELOPING THE

[00:40:01]

PRESERVATION OF THE NATIONAL PARKS SERVICE. THE PROJECT STARTED OUT WITH HIM , I WILL LET HIM EXPLAIN HOW HE DEVELOPED THE SCOPE TO PRESERVE THIS BUILDING. YOU KNOW, I WILL TURN

IT OVER TO BOB. >> THE RESTORATION, THANKS FOR

HAVING ME. >> BOB?

>> CAN YOU MUTE? >> I WILL HAVE TO CLOSE SOME

THINGS DOWN. >> JUST CLOSE THE MEETING, THE

LIFESTREAM. >> WITH THE INTEGRATION OF THE BUILDINGS, TO BETTER UNDERSTAND THE PROBLEMS AS I EXPLAINED TO PEOPLE, YOU CAN'T JUST DECIDE WHAT TO DO WITHOUT UNDERSTANDING THE PROBLEM. WE WORK TO FIND SOLUTIONS. I AM SORRY, I MADE A TRIP TO FORT PIERCE. THE BUILDING HAS PROBLEMS WITH MORE DETERIORATION , THE CONCRETE DETERIORATION , THE STUCCO IS FALLING OFF THE WALLS AND SO FORTH. WE PUT TOGETHER A SERIES OF RECOMMENDATIONS . THAT GAVE A BASIS ON WHICH TO PUT TOGETHER THEIR WORK PROGRAM AND THEIR PRICING. AFTER DOING THAT AND THEY DID PUT TOGETHER THAT PRICING AND STARTED TO DO THE WORK, I VISITED FORT PIERCE A COUPLE OTHER TIMES TO MAKE SOME DETERMINATION ABOUT PAINT COLORS AND BORDER COLORS AND SO FORTH.

IN ORDER TO HAVE THE BUILDING LOOKING , AS I TRIED TO EXPLAIN TO PEOPLE, NOT LIKE IT IS BRAND-NEW, BUT LIKE IT IS A 100-YEAR-OLD BUILDING THAT HAS BEEN WELL CARED FOR. THAT IS MY WAY OF APPROACHING THE AESTHETICS OF THE BUILDING.

TYPICALLY, WE PUT TOGETHER SPECIFICATIONS CONCERNING THE MORTAR AND THE CONCRETE REPAIRS . THERE IS AN AREA OF MISSING BRICKS , I COULD PROBABLY SHOW YOU SOME PICTURES OF, AND HOW TO GET A GOOD MATCH SO THE BUILDING REPAIRS WOULD NOT STAND OUT AND WOULD BLEND INTO THE ENTIRE BUILDING. I THINK THAT JIM'S CREW DID A REALLY GREAT JOB . THEY WERE THINKING EVEN AHEAD OF ME AS TO WHAT WOULD BE THE BEST WAY TO DEAL WITH SOME OF THESE ISSUES. SO I GIVE A REAL -- A SHOUT OUT OF PRAISE TO JIM'S CREW AND THE WORK THAT THEY DID. WHAT I SAW WAS TOTALLY COMPLETE . THE WORK I DID SEE WAS EXTREMELY WELL DONE. WITH THAT,

I WILL TURN IT BACK TO JIM. >> BOB WAS VERY INSTRUMENTAL.

YOU KNOW, THE KEY WAS TO MAKE SURE WE MATCH THE EXISTING MATERIALS. BOB WAS VERY HELPFUL WITH MAKING SURE THE MORTAR , THE COMPOSITION WAS THE SAME THAT WAS IN THE BUILDING , A HISTORIC MATCH. THE SAME WITH THE PATCHING OF THE CONCRETE. WE ACTUALLY SENT A PIECE OF THE CONCRETE OUT TO MARYLAND AND THEY SPECIALLY MATCH THE CONCRETE, THE SAME COMPOSITION AND COLOR. SO WE PUT A BUNCH OF DIFFERENT SAMPLES AND FOUND THE BEST COLOR MATCH . THE SAME WITH THE BRICK. UNFORTUNATELY, THE THIN UPPER WALL THE BRICK HAD COLLAPSED SO WE WERE ABLE TO SALVAGE THAT BRICK AND USE IT ON VISIBLE AREAS. YOU CAN SEE THE DIFFERENT SAMPLES. THAT IS DOWN BELOW. THE FIRST THING WE DID WAS STRIP THE PAINT OFF, WE WASHED THE BUILDING. WE WANTED TO SEE WHAT WE HAD BEFORE WE STARTED PUTTING SAMPLES IN. WE DID NOT WANT TO PUT SAMPLES IN UNTIL WE WERE READY TO REBUILD.

THIS IS JUST A PICTURE OF DOING THE CUTTINGOF THE SEVERELY DETERIORATED JOINTS. THE OFFSET, WE WANTED TO PRESERVE THE BUILDING, WE DON'T WANT TO MAKE IT LOOK NEW, WE WANT TO MAKE IT LOOK LIKE THE DAY IT WAS BUILT. IF YOU WANT TO JUMP IN, BOB, GO

AHEAD. >> YOU ARE DOING A GREAT JOB, JIM.

EXAMPLES OF THE BRICK WE CUT OUT, THERE WERE SOME LARGE AREAS THAT HAD DISLODGED OR MOVED SO WE HAD TO MOVE THOSE BRICKS.

HERE IS THE FINISHED PRODUCT OF THE MORTAR JOINTS . THESE ARE AREAS WHERE WE DID PATCHING. THOSE FRONT , BOB, HELP ME, WHAT

YOU CALL THEM, PILLARS? >> COLUMNS.

>> WE DID SOME CUSTOM PATCHING THERE, WHICH WAS A LITTLE BIT

[00:45:12]

CHALLENGING, BUT IN THE END, I THOUGHT IT LOOKED GOOD. HERE WE PUT IN A NEW STUCCO FOUNDATION. I THINK THAT TURNED OUT WELL.

HERE WAS , THIS WAS THE WALL I WAS TALKING ABOUT ON THE NORTH END. THE ONE WHERE THE BRICK HAD COLLAPSED. WE REBUILD EVERYTHING. SO FOR THE COMMISSION TO ASK US ABOUT THE FLASHING, THAT IS THE BLACK MATERIAL. WAS THAT YOU? LAUGHTER ] GOOD IDEA, RIGHT? SO WE ADDED THAT. WE REBUILT THE BRICK. SOME OF THAT WAS A MIX OF THE EXISTING BRICK AND THE NEW BRICK WE FOUND. I THOUGHT IT TURNED OUT WELL. YOU CAN SEE THE PAINTING, AND THE CUSTOM PAVING WITH CONCRETE. YOU CAN SEE THE TIME STAFF AT THE TOP. THAT WAS SARAH'S IDEA. I THOUGHT IT LOOKED GOOD SO THE COLOR STICKS OUT.

>> IT IS A MINERAL SILICATE COATING SO IT WON'T PEEL THE WAY YOU TYPICALLY THINK OF PAINT PEELING. FORMS A CHEMICAL BOND WITH THAT PART OF THE BUILDING ITSELF. IT IS NOT JUST A COATING. NOW IT IS WITH THE CONCRETE.

>> SEE, THAT IS WHY I HIRED HIM. >> I THINK IT TURNED OUT WELL.

WE ALSO REPLACED THE ROOFS ON THE NORTH SIDE AND THE ENTRANCE.

WE DID SOME REPLACING OF THE WINDOWS, A BUNCH OF BASEBALL PLAYERS THROW ROCKS AND THINGS THROUGH WINDOWS. THERE IS YOUR FINISHED PRODUCT. I THINK IT TURNED OUT WELL. THE PROJECT TEAM WAS GREAT, BOB, SARAH, WE WORKED TOGETHER, THE COMMON GOAL WAS TO RESTORE IT , I THINK WE ACCOMPLISHED IT. WE SHOULD ALL

PUT A FEATHER IN OUR CAP. >> I WILL SAY THAT I'VE GOTTEN MORE COMMENTS ON THIS BUILDING AND HOW IT LOOKS AND HOW IT HAS NEVER LOOKED SO GOOD . THE REST OF THE COMMISSION HAS SAID, YES, PEOPLE HAVE COMMENTED ON SOCIAL MEDIA. WAS ON THE FRONT PAGE OF THE PAPER HOW GOOD IT LOOKED. SO PEOPLE ARE NOTICING. THEY NOTICE HOW IT LOOKS, HOW BEAUTIFULLY RESTORED AND MANY PEOPLE, ALTHOUGH I DON'T KNOW HOW MANY ARE ALIVE THAT WENT TO THAT SCHOOL, THEY HAVE FOND MEMORIES OF THAT. SO THEY ARE HAPPY TO

SEE IT RESTORED. >> WE APPRECIATE IT. IT WAS A REALLY FUN PROJECT. YEAH, THANKS FOR ALL OF THAT.

>> ANYBODY ELSE? >> COMMISSIONER BRODERICK?

>> I MENTIONED THIS TO OUR FOLKS INTERNALLY PREVIOUSLY, THE REPORT BACK IS THAT THERE WAS NOT AN ISSUE BUT AS YOU ARE DRIVING EAST ON WARRANT, IT APPEARS TO BE, AND IT APPEARS BECAUSE IT IS A HIGH ROOF, ON THE TOP OF THE SOUTHWEST QUADRANT , WE HAVE SOME BROKEN AND MISSING TILE, WHICH I THINK SHOULD BE REPLACED. I DON'T THINK THAT IS IN YOUR SCOPE, BUT I BELIEVE IT SHOULD BE DEALT WITH NOW , MODIFY THE MATERIAL UNDERNEATH THE TILE TO PROTECT THAT. IT IS VERY SUBJECTED TO UV RAYS AND THINGS OF THIS NATURE. SO IS THAT SOMETHING YOU GUYS CAN INVESTIGATE OR IS THAT SOMETHING WE NEED TO BRING IN THE ROOFER WHO DID THE ORIGINAL FRAMEWORK MANY YEARS AGO? I JUST THINK IT SHOULD BE CHECKED OUT. I CAN SEE MISSING TILE.

>> WE SHOULD CHECK IT OUT. I DON'T KNOW WHO DOES THAT.

>> IS IT STILL OUT THERE? >> I THOUGHT YOU CHECKED IT OUT.

DID AND WE HAVE THE LIFT TRUCK OUT THERE.

>> I DID NOT KNOW EXACTLY WHERE IT WAS.

>> I HAVE DONE IT A FEW TIMES BUT HAVE NOT REPORTED TO YOU.

YOU ARE CORRECT ABOUT THAT. >> EAST ORANGE BUT I WILL TAKE A LOOK. SPENT GIVE YOU HEAD EAST ON ORANGE, THE SOUTHWEST QUADRANT OF THE ROOF, YOU WILL SEE AN AREA. YES, IT COULD HAVE BEEN A LIGHTNING STRIKE, ACTUALLY, POTENTIALY, THAT SHATTERED A BUNCH OF TILE. THERE IS SOMETHING GOING ON UP THERE.

>> OKAY. >> MY APOLOGIES FOR NOT DOING MY

INSPECTION SOONER. >> WHY WOULD YOU NOT WALK ON

THAT ROOF? >> EXACTLY. THEY WILL GET IT

TAKEN CARE OF. >> ANY OTHER -- YES, SIR.

[00:50:04]

>> I JUST WANT TO COMMENT ON A GREAT JOB. IT LOOKS GREAT. I, TOO, GET A LOT OF COMPLIMENTS ON IT. THIS IS A WIDELY LOVED BUILDING IN THE CITY OF FORT PIERCE. IT IS A GREAT THING THIS WAS DONE. MY GRANDPA WENT TO SCHOOL THERE. HE IS STILL ALIVE.

MY MOM ACTUALLY HAD A CLASS THERE WHEN SHE WAS IN MIDDLE SCHOOL. SO IT GOES WAY BACK IN THE FAMILY. IT IS EXCITING TO SEE IT LOOKS SO NICE. HOPEFULLY ONE DAY WE CAN GET SOMEBODY IN

THERE. >> THE INSIDE NEEDS LOVE.

>> ONE DAY. >> HAVE YOU SEEN IT?

>> YES. IT IS A MESS IN THERE. >> YES. ABOUT A YEAR AGO I DID A

TOUR. >> GREAT JOB, GUYS. I WILL GO WITH YOUR LAST COMMENT. BOARD, LET'S NOT STOP HERE. WE GOT THIS BEAUTIFUL BUILDING SITTING THERE. WE'VE GOT THAT LOT THAT IT SITS ON. LET'S PUT OUR HEADS TOGETHER , STAFF, TOO, NOT JUST THE BOARD, STAFF, LET'S PUT OUR HEADS TOGETHER TO SEE HOW WE CAN USE THE SCHOOL AND THAT AREA AS A DRAWING SPOT FOR, IS NOT DOWNTOWN, BUT IT COULD ALMOST BE SOME TYPE OF FAMILY , SOME TYPE OF ACTIVITY , SOMEWHERE TO GO TO THE COMMUNITY TO THAT SPOT WITH THIS SCHOOL AS THE CENTERPIECE BECAUSE RIGHT NOW IT IS BEAUTIFUL. I DRIVE OUT THERE, YOU TURN YOUR HEAD BECAUSE YOU WANT TO SEE IT. NOW YOU ARE WATCHING IT AND I'VE GOTTEN EMAILS, I'VE GOTTEN THE PHONE CALL SAYING GOOD JOB. SOME OF THE PEOPLE WANT TO KNOW WHY WE ARE SPENDING THE MONEY TO DO IT NOW? OKAY, I GET IT. GOOD JOB. SO I DID TAKE A TOUR.

>> IT IS ROUGH? >> I AM NOT EVEN GETTING GIVE A

GUESS WHAT THAT IS LIKE. >> SO, IF, YOU KNOW, I AM --

>> WE HAVE PLANS. >> I KNOW WE HAVE PLANS BUT I AM KIND OF TORN. I AM KIND OF TORN IF WE REBUILD IT INSIDE FOR THE WEAR AND TEAR OF TRYING TO USE IT SOMEWHERE INSTEAD OF JUST,

YOU KNOW, AND -- >> BUILDINGS FALL APART.

>> I UNDERSTAND BUT IT SITS ON THAT CORNER. THAT IS ENOUGH AREA ON THAT CORNER TO DO SOMETHING ELSE. BUT I UNDERSTAND. I UNDERSTAND WE'VE GOT IT AND WE NEED TO USE IT. WE JUST GOT THROUGH TALKING ABOUT IT LOOKS LIKE WE ARE IN THE BUSINESS OF BUILDING MUSEUMS. WE JUST GOT DONE TALKING ABOUT ONE ON THE OTHER PART OF, YOU KNOW, THE CITY. MAYBE WE START REACHING OUT TO SOMEBODY LOOKING OUT FOR A MUSEUM FOR SOME OLD SCHOOLS OR SOMETHING. I WILL BE HONEST WITH YOU. YOU'RE COMING UP, LET'S

DO IT. >> THEY CAN GO THE HIGH RFP

ROUTE HERE. >> COMMISSIONER, I AM THINKING THAT JUST HOW WE WERE BLESSED TO FIND THESE PEOPLE HERE IN FRONT OF US TONIGHT, TO PUT THIS BUILDING BACK RIGHT , THEY MIGHT KNOW SOMEBODY , HINT, HINT, THAT CAN GO IN. I AM PRETTY SURE THEY

LOOKED. >> AND WITH A LOT OF MONEY.

>> THEY LOOKED IN AND SAW WHAT IT WAS SO THEY MAY HAVE SOME IDEAS. IT IS JUST SOMETHING, I DON'T WANT TO STOP HERE. IT IS BEAUTIFUL. THEY DID A GREAT JOB. LET'S PUT OUR THINKING CAPS ON TO SEE HOW WE CAN MAXIMIZE THIS BUILDING AND THAT AREA. WE ARE TALKING ABOUT RENOVATING DOWNTOWN. IT IS NOT THAT FAR FROM DOWNTOWN. IT IS IN WALKING DISTANCE. IF YOU REALLY WANT TO, IF YOU ARE FAMILIAR, IT'S THE ANCHOR.

>> IT'S THE ANCHOR. >> COME ON IN. THAT IS ALL I AM SAYING, I AM ASKING STAFF, I AM ASKING US, YOU KNOW, PUT YOUR THINKING CAPS ON. YOU GUYS MIGHT ALREADY BE WAY AHEAD OF ME AND JUST SAY, WAIT A MINUTE, HERE SHE COMES.

>> WE ARE TRYING. >> I AM TRYING. I AM TRYING.

>> I ONLY KNOW WHAT YOU GIVE ME, GIRL. IF YOU HAVE SOMETHING, I

WILL SIT BACK AND BE QUIET. >> I HAVE SOMETHING. WE HAVE

SOMETHING. >> SOMEBODY CAN I ENLIGHTEN US? IS THIS LOCKED DOWN INFORMATION?

>> OMI? I DON'T KNOW. >> WHILE YOU ARE HERE, GO AHEAD

AND,. >> HI, GUYS. MADAM CHAIR, MEMBERS OF THE FPRA BOARD, YES, MA'AM, THANK YOU FOR ALL THE

[00:55:01]

HARD WORK. WE HAVE BEEN GETTING SO MUCH FEEDBACK, WE ARE GOING TO SET THIS UP FOR AN AWARD SO WE CAN GET RECOGNITION AT THE STATE LEVEL, THERE. THIS REALLY CREATED THAT BUZZ AND EXCITEMENT ABOUT THIS AREA. WE TALKED ABOUT PUTTING THIS IN THE BUDGET THE LAST FISCAL YEAR, OKAY, LET'S SECURE A BUILDING ENVELOPE AND HAVE IT LOOK GOOD AT THE CORNERSTONE OF OUR ARTS DISTRICT. OKAY, NOW IT IS, WHAT DO WE WANT TO SEE HERE? INSTEAD OF US TALKING ABOUT IT, WE PUT IN A PROJECT-BASED BUDGET FOR THIS FISCAL YEAR AND THE SPECIFIC AUTHORIZATION WILL COME BEFORE YOU IN A SUBSEQUENT MEETING, PROBABLY IN APRIL, IT WAS A, TO DO SOMETHING SIMILAR TO WHAT WE ARE DOING FOR MARINA PARK THAT YOU ALL APPROVED TONIGHT, GET COMMUNITY INPUT, DOING WHAT WE ARE DOING WITH THE WESTERN PENINSULA AND REALLY LOOK AT THIS AREA. IT IS SUCH AN ASSET. WE GET A LOT OF CALLS ABOUT THE VACANT PARCELS AROUND, LET'S DO IT RIGHT AND NOT JUST TAKE THE FIRST OFFER THAT COMES OUR WAY. LET'S REALLY GET TO SEE WITH THE COMMUNITY WANTS TO SEE. THERE HAS BEEN TALK ABOUT A CULTURAL CENTER HERE MOVING THE HISTORY MUSEUM. THERE HAVE BEEN A LOT OF CONVERSATIONS BUT NOW THAT WE HAVE THIS MOMENTUM WITH THE EXTERIOR LOOKING SO GREAT, I THINK WE CAN NOW GARNER THAT COMMUNITY IMPACT WE WANT. YES, SIR, WE ARE ON IT.

>> ALL IT WILL TAKE IS A■ DUMP TRUCK LOAD FULL OF CASH. THIS WILL BE A MASSIVELY EXPENSIVE RENOVATION.

>> I AGREE, COMMISSIONER, BUT IF HE GET THE RIGHT BUZZ IN THE RIGHT COMPANY TO SEE OUR VISION, COME AND SEE IT AND SEE OUR VISION, IT CAN WORK. THE PEOPLE IN TALLAHASSEE ARE LISTENING, LIKE YOU ALWAYS DO, GOVERNOR, COME LOOK AT THIS BUILDING. COME AND SEE WHAT IS GOING ON. THAT IS ALL I AM SAYING. I WILL BE

QUIET AND WAIT FOR APRIL. >> NO, I THINK YOU ARE RIGHT ON.

I WAS HOPING THIS PRESENTATION WOULD SPRINGBOARD THE CONVERSATION INTO, OKAY, WHAT IS NEXT? I DON'T REALLY MAKE SENSE INTERIOR WITHOUT KNOWING WHAT E- THE USER WOULD BE, RIGHT?

>> MORE DEMO DOES NOT NEED TO BE DONE.

>> WE WILL BE COMING BACK TO YOU IN A COUPLE MONTHS. THIS WILL BE MISS DELGADO'S PROJECT AND WE ARE EXCITED TO SEE IT COME TO

FRUITION. >> THANK YOU.

>> IF I COULD JUMP BACK IN FOR JUST A MINUTE?

>> OKAY. >> IN MY REPORT ABOUT A YEAR AGO, THERE WERE POTENTIAL USES. POTENTIALLY USING THE SPECIAL TAX CREDITS THAT ARE AVAILABLE FOR REHABILITATION OF HISTORIC

BUILDINGS. >> I WOULD BE HAPPY WITH THAT.

OKAY. THANK YOU, BOB. THANK YOU FOR REMINDING ME.

>> I THINK WE HAVE A RECOMMENDATION FOR AN ARCHITECT

RIGHT NOW. >> I WILL RECOMMEND HIM.

>> ANYTHING ELSE? NICE JOB. WE REALLY, REALLY APPRECIATE IT.

YOU MADE US LOOK GOOD. >> IT WAS GREAT WORKING WITH YOU

GUYS. IT WAS A COMMON GOAL . >> THANK YOU.

>> THANK YOU VERY MUCH. THANK YOU. THANK YOU, BOB.

[b. Resolution FPRA 25-02 appointing Donna Benton to the CRA Advisory Board as Commissioner Taylor's appointee. ]

>> THANK YOU. THE NEXT ITEM IS FPR A RESOLUTION 25-02, APPOINTING THE FORT PIERCE SPECIAL DISTRICT CERTIFYING THE APPOINTMENT TO THE MEMBER REDEVELOPMENT COMMITTEE FOR AN

EFFECTIVE DATE. >> COMMISSIONER TAYLOR? WOULD

YOU LIKE TO MAKE THE MOTION? >> MOTION TO APPROVE.

>> SECOND. >> THE MOTION IS SECONDED, CALL

THE ROLL. >>

[a. FPRA Programs & Activities Summary Report - February 2025]

THE NEXT ITEM IN STAFF COMMENTS. >> YES, MA'AM. WE HAVE ATTACHED FOR YOU THERE FPRA ACTIVITIES AND SUMMARY REPORT. AS YOU CAN SEE, THERE ARE LOTS OF FANTASTIC PROJECTS THAT ARE HAPPENING WITH OUR FPRA. IF YOU HAVE ANY QUESTIONS, WE HAVE STAFF AVAILABLE TO ANSWER ANY. I WILL JUST TAKE A FEW HIGHLIGHTS OUT OF THE MAC I WILL MAKE SURE YOU ARE AWARE OF. THE JCPENNEY PARKING LOT IS COMING UNDER CONSTRUCTION. IT IS GOING TO BE CLOSED BEGINNING FEBRUARY 17 FOR TWO WEEKS. THEY WILL DO A NEW CURB, THEY WILL MILL, OVERLAY AND PAINT IT. WE ARE GETTING THE WORD OUT TO ALL OF THE DOWNTOWN BUSINESS OWNERS, MISS DELGADO HAS BEEN WORKING THROUGH THE DPA BUT WE WILL REALLY TOUCH EVERYBODY WE POSSIBLY CAN TO MAKE SURE THEY ARE ALL AWARE BECAUSE IT WILL BE AN INCONVENIENCE BUT LUCKILY, IT IS ONLY TWO WEEKS WHERE THE CONTRACTOR FOR THIS PROJECT AND %-Ú

[01:00:03]

WITH US ON THIS. WE ARE HOPING TO MINIMIZE THE IMPACTS TO THE COMMUNITY AS MUCH AS WE POSSIBLY CAN. THE RFP FOR THIS IS OUT, WE ARE LOOKING FORWARD TO GETTING THOSE RESPONSES BACK IN.

>> WE ARE UNDER A CONE OF SILENCE.

>> WE ARE UNDER A CONE OF SILENCE.

>> I DID WANT TO TALK A LITTLE BIT, JUST TO GIVE YOU A BRIEF UPDATE ON THIS PROJECT. WE HAVE SEEN A LOT OF STUFF ABOUT THAT.

WE TALKED AS YOU ARE BUILDING DEPARTMENT TODAY AND THEY ARE ABOUT 80 TO 85% COMPLETE IN ORDER TO OBTAIN THEIR TEMPORARY CERTIFICATE OF OCCUPANCY FOR THE FIRST FLOOR. THEY HAVE BEEN WORKING VERY CLOSELY WITH THE BUILDING DEPARTMENT. AT THIS POINT, WE JUST NEED THE AIR-CONDITIONERS INSTALLED IN ORDER FOR THEM TO BECOME OPERATIONAL AND FOR THEM TO BE ABLE TO OPEN. THERE ARE MORE THINGS THEY NEED TO DO BUT THEY ARE WORKING TO GET IT OPEN TO THE PUBLIC. IF YOU HAVE ANY OTHER QUESTIONS, I AM MORE THAN HAPPY TO ANSWER THEM.

>> QUESTIONS FROM STAFF? >> YES, I LOOKED THROUGH THEM.

THERE IS A LOT OF GOOD STUFF IN THERE.

>> YEAH, IT IS VERY, VERY POSITIVE.

>> IT IS A LOT OF LITTLE THINGS SOMETIMES BUT THOSE LITTLE THINGS ADD UP QUICKLY. IT CAN MAKE A HUGE DIFFERENCE FOR THE

COMMUNITY. >> OKAY.

>> I HAVE A QUESTION. >> SURE.

>> AT THE FPRA, OBVIOUSLY, WE ARE SPENDING MONEY.

>> YES, SIR. >> I WOULD LIKE TO RECEIVE AT THE NEXT FPRA MEETING, A FINANCIAL SNAPSHOT OF WHERE THE FPRA AND ITS FUNDING STANDS . AND HAVE JUST A GENERAL DISCUSSION AS TO , YOU KNOW, WE ARE SITTING AND TALKING ABOUT SPENDING MORE MONEY ON THE MUSEUM, WHICH I FULLY ADVOCATE, THE STAGING BUILDING, THAT IS REAL MONEY, RIGHT? THERE IS NO $45,000 CHANGE ORDERS. THAT IS GOING TO BE A PAINFUL EXPERIENCE FOR SOMEBODY TO GO THROUGH TO RENOVATE THE INTERIOR OF THAT BUILDING. UNFORTUNATELY, THERE WAS A LOT OF DEMOLITION WORK DONE PREMATURELY. THAT IS WATER UNDER THE BRIDGE. I WOULD JUST LIKE TO GET AN IDEA AS TO WHAT THAT ANNUAL FUNDING LIMIT IS, WHAT OUR COMMITMENTS ARE AND WHAT WE HAVE FOR AVAILABLE CASH

FROM OTHER PROJECTS. >> ABSOLUTELY. SPENT JUST TO GET A BETTER MENTAL HANDLE ON THAT.

>> DEFINITELY, NO PROBLEM. >> YOU AND I DISCUSSED THE POSSIBILITY OF INVESTIGATING THAT TRAFFIC PROJECT.

>> WE ARE PRETTY CERTAIN A PORTION OF IT COULD BE. YEAH, WE

[10. BOARD COMMENTS]

WILL INCLUDE THAT IN THE FINANCIAL REPORT AT OUR NEXT

MEETING. >> I WOULD BE INTERESTED IN THAT. ANY OTHER QUESTIONS? WE WILL MOVE ONTO BOARD COMMENTS.

ANY BOARD COMMENTS? >> JUST A COUPLE QUICK ONCE. I AM TOURING THE FACILITY TOMORROW. I THINK, WHILE I AM THERE, THE MUSEUM WILL BE TOWARD ALSO SO I CAN SEE WITH THESE GUYS ARE UP TO. I WILL GET A HANDLE ON THIS IMPACT GLASS AND SEE WHAT MY THOUGHTS ARE AS FAR AS TIMING ON THE GLASS AND WHAT THAT WILL BE. I THINK THAT WILL BE PART OF MY MANTRA AS WE HAVE THESE RENOVATIONS GOING ON. I AM PUTTING ON MY HARD HAT AND DROPPING BY. I HAVE EXTRA HARDHATS, TOO, I KNOW JAMES DOES

NOT NEED ONE. >> I HAVE A TON OF THEM.

>> THAT IS IT. >> THANK YOU. I APPRECIATE THE STAFF REPORT. I THUMBED THROUGH THAT, IT WAS VERY GOOD READING.

I KNOW AT SOME POINT WE ARE GOING TO HEAR FROM THE POLICE DEPARTMENT ABOUT THE DETAILS, RIGHT?

>> YES, SIR. >> I WAS QUITE DISTURBED ON THE DETAIL ON NORTH 25TH STREET. WE ARE TALKING ABOUT TWO BLOCKS, THREE BLOCKS AT THE MOST. THERE WERE 23 CALLS FOR DISTURBANCES.

NOISE, DISTURBANCE. THEY CATEGORIZE IT AS DISTURBANCE. I WILL GO WITH WHATEVER THAT IS. 30 DAYS IN DECEMBER, 31 DAYS IN DECEMBER. SO IT IS ALMOST A CALL A DAY, REALLY, WITH WHAT IS GOING ON THERE. WE HAVE TO GET A BETTER HANDLE. I KNOW WE ARE BUT IT JUMPED OUT TO BE. I AM REALLY TRYING TO UNDERSTAND THAT. AND THEN, YOU KNOW, WHAT ARE WE DOING AND WHAT DO WE HAVE TO DO TO SUPPORT LAW ENFORCEMENT TO HAVE THE TOOLS THEY NEED TO ENFORCE THIS? ALSO IN THAT REPORT WERE, IF I READ IT RIGHT, IT HAD SOMETHING TO DO WITH OPEN CASES OR SOME ISSUES OR

[01:05:08]

WHATEVER. I AM CONCERNED ABOUT THAT. I AM CONCERNED ABOUT THE ENFORCEMENT. I NEED TO UNDERSTAND, WHAT DO WE NEED TO DO TO SUPPORT THAT? I ENCOURAGE YOU TO LOOK AT IT. IT IS A STARK CONTRAST. ONE POINT WE HAD A LOT OF DISTURBANCES ON THE BEACH.

THAT HAS GONE WAY DOWN. SO DID THE DETAIL WORK THERE. WE NEED THAT SAME IMPACT HERE. I'M NOT SAYING WHY, IT IS STILL EARLY MAYBE, BUT INDICATORS OF WHAT IS HAPPENING IS NOT HAVING THE IMPACT I THINK IT SHOULD BE. I'M LOOKING FORWARD TO THAT CONVERSATION AND DIGGING INTO IT. IF YOU HAVE NOT LOOKED AT THE LAST GRAPH, TAKE A LOOK AT IT. YEAH.

>> COMMISSIONER, DO YOU HAVE ANYTHING?

>> NO. >> I SAID ENOUGH, MADAM CHAIR, I SAID ENOUGH. I

* This transcript was compiled from uncorrected Closed Captioning.